CEntra Health Lynchburg General Hospital – NE Tower Addition
New Construction Commissioning (NCCx)
Lynchburg, VA
Project Year
2024-Present
Project Size
206,400 sq ft (9 Floor Addition)
Project Cost
$290 Million
Project Type
Healthcare – Acute Hospital
Owner Reference
Marshall Womack, Manager of Planning and Construction, [email protected]
Project Description
-
- Unique features: Geothermal Central Plant, adding a Tower with no additional utility cost.
- Envinity was selected as the third-party commissioning authority from design phase through acceptance and warranty. Project challenges include an aggressive Energy Use Intensity goal for both the existing facility and new addition. Approaches for meeting this goal include a geothermal central plant, heat recovery chillers, and utilizing Monitoring-based Commissioning (MBCx) approach for both existing hospital and new tower. The project includes a 5-story addition to the existing hospital and surface parking located adjacent to the existing hospital. Few firms in the nation can customize and utilize Fault Detection and Diagnostic (FDD) tools to commission projects at this scale. This project is expected to meet qualifications to become LEED Gold upon completion in 2027.
Cx Scope
Envinity was engaged during the design phase and provided significant input towards achieving the Owner’s Project Requirements including energy use intensity targets. Energy Conservation Measures that were recommended and implemented include a comprehensive unoccupied setback and energy recovery units.
Commissioned Systems
Mechanical, Electrical (Essential and Normal), Plumbing, Fire Protection, Nurse Call